- Manuals
- Brands
- Dell EMC Manuals
- Switch
- S5200F-ON Series
- Setup manual
Hide thumbs Also See for S5200F-ON Series:
- Installation manual (57 pages)
-
- Contents
- Table of Contents
- Bookmarks
Table of Contents
-
Table of Contents
- 1 About this Guide
-
Regulatory
-
Related Documents
-
Information Symbols
-
- 2 Site Preparations
-
Site Selection
-
Cabinet Placement
-
Rack Mounting
-
Switch Ground
-
Fans and Airflow
-
Power
-
Storing Components
-
- 3 S5200F-ON Series Switch Installation
-
Unpack
-
Ground Cable
-
Rack or Cabinet Installation
-
Rack Mount Safety Considerations
-
-
One-Half U Front-Rack Installation
-
One-Half U Switch Installation
-
One-Half U Switch Removal
-
-
One U Readyrails Installation
-
1U Tool-Less Mount Installation
-
Two-Post Flush-Mount Installation
-
Two-Post Center-Mount Installation
-
Four-Post Threaded Installation
-
S5200F-ON Series Switch Installation
-
-
Two U Four-Post Rack Assembly
-
Four-Post Rack Mount
-
-
DC Power Connections
-
S5212F-ON Only DC Power Connections
-
Optics Installation
-
Optics Removal
-
-
Switch Power-Up
-
Power up Sequence
-
-
After Switch Installation
-
- 4 Specifications
-
Chassis Physical Design
-
- 5 Support
Advertisem*nt
Quick Links
- 1 Optics Installation
- 2 Switch Power-Up
- 3 After Switch Installation
- 4 Chassis Physical Design
- Download this manual
See also: Installation Manual
S5200F-ON Series
Setup Guide
Table ofContents
Advertisem*nt
Table of Contents
Related Manuals for Dell EMC S5200F-ON Series
-
Switch Dell EMC S5232F-ON Installation Manual
(57 pages)
-
Switch DELL EMC S5048F-ON Installation Manual
(45 pages)
-
Switch Dell EMC S4048T-ON Installation Manual
(47 pages)
-
Switch Dell EMC S4112F-ON Installation Manual
S4112–on series (44 pages)
-
Switch Dell EMC PowerSwitch S4100-ON Series Installation Manual
(205 pages)
-
Switch Dell EMC PowerSwitch S4148U-ON Configuration And Deployment Manual
Networking fcoe deployment in npg mode (37 pages)
-
Switch Dell EMC PowerSwitch S4810-ON Installation Manual
(35 pages)
-
Switch Dell EMC PowerSwitch N3200-ON Series Installation Manual
(86 pages)
-
Switch Dell EMC PowerSwitch N1100-ON Series Getting Started Manual
(63 pages)
-
Switch Dell EMC PowerSwitch N2200-ON Series Installation Manual
(60 pages)
-
Switch Dell EMC PowerSwitch N3200-ON Series Installation Manual
(51 pages)
-
Switch Dell EMC Z9264F-ON Installation Manual
(45 pages)
-
Switch Dell EMC Z9264F-ON Setup Manual
(20 pages)
-
Switch Dell EMC PowerSwitch Z9332F-ON Installation Manual
(36 pages)
-
Switch Dell EMC PowerSwitch Z9332F-ON Setup Manual
(16 pages)
-
Switch Dell EMC N20 Series Manual
Dell networking os conversion guide for the n20xx/n30xx series (10 pages)
Summary of Contents for Dell EMC S5200F-ON Series
- Page 1 S5200F-ON Series Setup Guide...
- Page 2 Notes, cautions, and warnings NOTE: A NOTE indicates important information that helps you make better use of your product. CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem. WARNING: A WARNING indicates a potential for property damage, personal injury, or death.
-
Page 3: Table Of Contents
Cabinet placement................... 8 Rack mounting..................8 Switch ground...................8 Fans and airflow..................9 Power......................9 Storing components................10 3 S5200F-ON Series switch Installation........... 11 Unpack..................... 12 Ground cable................... 13 Rack or cabinet installation..............13 Rack mount safety considerations..........14 One-half U front-rack installation............15 One-half U switch installation............17... - Page 4 Four-post rack mount..............30 DC power connections................33 S5212F-ON only DC power connections..........35 Optics installation................... 36 Optics removal.................. 37 Switch power-up..................37 Power up sequence................37 After switch installation................. 38 4 Specifications................39 Chassis physical design................. 39 5 Support..................44 Contents...
-
Page 5: About This Guide
About this guide This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting modules, and connecting to a power source. CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment. WARNING: Only trained and qualified personnel can install this equipment. -
Page 6: Related Documents
Topics: • Related documents • Information symbols Related documents For more information about the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F- ON, S5224F-ON, and S5212F-ON) switches, see the following documents. • OS10 Enterprise Edition Release Notes • OS10 Enterprise Edition User Guide •... -
Page 7: Site Preparations
• Data centers • Other locations where the National Electric Code (NEC) applies For more information about the S5200F-ON Series switch specifications, see Specifications. NOTE: Install the switch into a rack or cabinet before installing any additional components such as cables or optics. -
Page 8: Cabinet Placement
For more information about switch storage and environmental temperatures, see Specifications. Cabinet placement Install the S5200F-ON Series switch only in indoor cabinets designed for use in a controlled environment. Do not install the switch in outside cabinets. For cabinet placement requirements, see Site selection. -
Page 9: Fans And Airflow
Fans and airflow Fan installation is completed as part of the Factory Install based on the stock keeping unit (SKU) type. The S5200F-ON Series switch has SKUs that support the following configurations: • AC PSU with fan airflow from the I/O to the PSU—normal •... -
Page 10: Storing Components
Storing components If you do not install your S5200F-ON Series switch and components immediately, properly store the switch and all components following these guidelines: • Storage location temperature must remain constant. The storage range is from -40° to 70°C (-40° to 158°F). -
Page 11: S5200F-On Series Switch Installation
S5200F-ON Series switch Installation To install the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch, complete the installation procedures in the order presented in this section. Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). -
Page 12: Unpack
For the S5212F-ON and S5296F-ON switches only: the USB extension cable is packaged separately. Do not throw it away. When unpacking the switch, ensure that the following items are included: • One S5200F-ON Series switch • Two sets of rail kits, no tools needed •... -
Page 13: Ground Cable
To attach a ground cable to the switch, use the included M4 screws. NOTE: For an AC-powered switch, although the third conductor of the AC power cord provides a ground path, Dell EMC recommends grounding your switch with a dedicated ground wire. NOTE: For a DC-powered switch, the only way to safely ground your switch is to attach a dedicated ground wire. -
Page 14: Rack Mount Safety Considerations
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: use of power strips. • Do not mount the equipment with the fan panel facing in the downward position. S5200F-ON Series switch Installation... -
Page 15: One-Half U Front-Rack Installation
Line up the three holes on the inner switch rail with the dual-tray mounting heads. Figure 2. Dual-tray and rack mounting rail Attach the rail to the dual tray. Slide the rail back until it locks into place. Repeat with the other side. S5200F-ON Series switch Installation... - Page 16 Figure 4. Attach the dual-tray front to the four-post rack front Attach the rear dual-tray switch rails to the four-post rack from the rear. Secure the dual tray to the rack using two user-supplied screws for each rack post. S5200F-ON Series switch Installation...
-
Page 17: One-Half U Switch Installation
Tighten all mounting screws to securely mount the dual tray into the four-post rack. Figure 6. Secure the dual-tray in the four-post rack One-half U switch installation Install one or two half-U switches in the four-post rack-mounted dual tray. Install one switch into either dual-tray slot from the front. S5200F-ON Series switch Installation... - Page 18 The switch is fully inserted when it presses the stop feature on the dual tray. The front switch latch snaps the switch into place. Figure 8. Dual-tray stop feature Insert the second switch in the open dual-tray slot if you are installing two switches. S5200F-ON Series switch Installation...
-
Page 19: One-Half U Switch Removal
Figure 9. Switch release latches Figure 10. Switch release arrow One U ReadyRails installation For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded S5200F-ON Series switch Installation... - Page 20 To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. Figure 11. Separate rails S5200F-ON Series switch Installation...
-
Page 21: 1U Tool-Less Mount Installation
Align and seat the front flange pegs in the holes on the front side of the vertical post. NOTE: Be sure that the rails click into place and are secure. Repeat this procedure for the second rail. S5200F-ON Series switch Installation... -
Page 22: Two-Post Flush-Mount Installation
To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting, use a Torx screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back flange castings. S5200F-ON Series switch Installation... - Page 23 Attach one rail to the front post flange with two user-supplied screws, item 2. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, item 3. Repeat this procedure for the second rail. S5200F-ON Series switch Installation...
-
Page 24: Two-Post Center-Mount Installation
1. Figure 14. Two-post center-mount installation Slide the back bracket towards the post. Secure it to the post flange with two user- supplied screws, items 2 and 3. Repeat this procedure for the second rail. S5200F-ON Series switch Installation... -
Page 25: Four-Post Threaded Installation
For more installation instructions, see the installation labels attached to the rail assembly. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx driver. Retain the latch castings for future rack requirements. S5200F-ON Series switch Installation... -
Page 26: S5200F-On Series Switch Installation
For each rail, attach the front and back flanges to the post flanges with two user- supplied screws at each end. S5200F-ON Series switch installation For the 1U two-post configurations for the S5248F-ON, S5232F-ON, and S5224F-ON switches, slide the switch into the rails in the same manner as the four-post configurations. - Page 27 NOTE: For more information, see the installation instruction labels on the rail. Attach the inner switch rails to the S5200F-ON Series switch. Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place.
- Page 28 After you install both rails, line them up on the ReadyRails. Slide the switch in until it is flush with the front of rack. About three inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently sliding out and falling. S5200F-ON Series switch Installation...
- Page 29 Do not the use the mounted Ready-Rails as a shelf or a workplace. Tighten the two thumb screws and rack screws. To remove the chassis from the rack or cabinet, press in the two side-release bars on the chassis at the same time and slide the chassis forward. S5200F-ON Series switch Installation...
-
Page 30: Two U Four-Post Rack Assembly
WARNING: These instructions are a condensed reference. Read the safety Safety, Environmental, and Regulatory information booklet instructions in your before you begin. NOTE: The illustrations in this document are not intended to represent a specific switch. S5200F-ON Series switch Installation... - Page 31 Align the chassis with the rails and slide the chassis into the rack. Tighten the screws on each side of the chassis’s front panel, items 1 and 2. To remove the chassis from the rack, loosen the screws and slide the chassis out of the rack. S5200F-ON Series switch Installation...
- Page 32 Figure 18. S5296F-ON installation Extra screws to restrict front-back Main screw movement of the switch. S5200F-ON Series switch Installation...
-
Page 33: Dc Power Connections
DC power connections NOTE: Use the following instructions for all S5200F-ON Series switches except for the S5212F-ON switch. To connect DC power to the S5212F-ON switch, see S5212F-ON only DC power connections. Each DC powered system comes with a set containing a prewired (3-inch 8AWG) power supply connector and a four-screw wiring block. - Page 34 WARNING: Never try to force the power connector into or out of the DC PSU power socket. S5200F-ON Series switch Installation...
-
Page 35: S5212F-On Only Dc Power Connections
S5212F-ON only DC power connections NOTE: Use the following instructions for the S5212F-ON switch only. For all other S5200F-ON Series switches, see DC power connections. Each DC PSU comes with a connector cable. One cable is provided for each DC PSU. -
Page 36: Optics Installation
Insert the optic into the port until it gently snaps into place. NOTE: When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below the ports. S5200F-ON Series switch Installation... -
Page 37: Optics Removal
Do not jerk or tug repeatedly on the tab. Switch power-up Supply power to the S5200F-ON Series switch after you mount it in a rack or cabinet. Reinspect your switch before power up. Verify the following: •... -
Page 38: After Switch Installation
After switch installation After you have securely installed and powered on the S5200F-ON Series switch: • If you are using Dell EMC software, see switch documentation at www.dell.com/ support. • If you are using third-party software, see ONIE documentation at www.onie.org. -
Page 39: Specifications
Specifications This section lists the S5200F-ON Series switch specifications. CAUTION: Operate the product at an ambient temperature not higher than 45°C (113°F). CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. Replace only with same or equivalent type of battery. Dispose of the batteries according to the manufacturer's instructions. - Page 40 Parameter Specifications S5212F-ON: 7.87 inches (199.8 mm) S5232F-ON: 18.1 inches (460 mm) Depth S5248F-ON: 18.1 inches (460 mm) S5296F-ON: 20.1 inches (511 mm) S5224F-ON: 18.1 inches (460 mm) S5212F-ON: 16 inches (406.4 mm) S5232F-ON: 21.6 lbs (9.8 kg)—PSUs and Chassis weight with factory-installed fans components S5248F-ON: 21.4 lbs (9.7 kg)—PSUs and...
- Page 41 S5212F-ON: 304W = 1037 BTU/Hr Maximum operational altitude 10,000 feet (3,048 meters) Maximum non-operational altitude 39,370 feet (12,000 meters) Shock Dell EMC Spec SV0115 Table 3. AC power requirements Parameter Specifications S5232F-ON: 100–240 VAC 50/60 Hz Power supply S5248F-ON: 100–240 VAC 50/60 Hz S5296F-ON: 100–240 VAC 50/60 Hz...
- Page 42 Parameter Specifications S5212F-ON: 100-240 VAC 50/60 Hz S5232F-ON: 5.8A@110VAC and Maximum current draw per system 2.4A@220VAC S5248F-ON: 5.8A@110VAC and 2.4A@220VAC S5296F-ON: 8.2A@110VAC and 4.1A@220VAC S5224F-ON: 4.2A@110VAC and 2.1A@220VAC S5212F-ON: 2.8A@110VAC and 1.4A@220VAC S5232F-ON: 635W maximum Maximum power consumption S5248F-ON: 647W maximum S5296F-ON: 893W maximum S5224F-ON: 455W maximum S5212F-ON: 304W maximum...
- Page 43 Table 4. DC power requirements Parameter Specifications Minimum and maximum input voltage range –40VDC minimum S5232F-ON: 15.9A @40VDC Maximum current at full load with fan S5248F-ON: 16.2A @40VDC S5296F-ON: 22.3A @40VDC S5224F-ON: 11.4A@40VDC S5212F-ON: 7.6A@40VDC Specifications...
-
Page 44: Support
Support The support site provides documents and tools to help you effectively use your equipment and mitigate network outages. Through the support site you can obtain technical information, access software upgrades and patches, download available management software, and manage your open cases. The support site provides integrated, secure access to these services.
This manual is also suitable for:
S5232f-onS5248f-onS5224f-onS5296f-onS5212f-on